SOLUTION:
Manufactured replacement switches in two weeks
Knowing its reputation for quick andinnovative solutions,
the contractor called in Penn Panel to quickly design and manufacture
custom switchgear for the system. After a rapid survey to see what was
required, Penn Panel's engineers took advantage of their outstanding rapport
with Philadelphia Electric Company (PECO) to determine exact code requirements
and obtain rapid approvals.
The
new switchgear was designed to pick up existing electrical conduit locations,
minimizing the expense associated with rerouting cables. And Penn Panel
even supplied custom copper bus adapters at the last minute so that another
supplier's transformer could be connected immediately. The entire project
was designed, manufactured, approved and shipped in just two weeks so
that the SuperFresh store could again supply the residents of Society
Hill with daily necessities.
|