Schools Out PROBLEM: |
|||
|
|
SOLUTION: A permanent solution was designed, engineered,
assembled, and shipped less than two weeks later. The breaker manufacturer
air freighted the brea The new breaker was installed just days later by the contractor. The entire job was an example of great teamwork between Penn Panel & Box Company, the breaker manufacturer, and the contractor. The final result was a minimum amount of downtime, as well as a long-term solution to the schools problem.
|
||
|